Sample inspection report
This is the shape of every DynXGen report: a one-page summary, findings sorted by severity, photos, readings and an insurance-ready summary. The property and findings below are illustrative.
What is in every report
Summary page
Counts by severity and the top items, ready to forward.
Findings
Photo, location, meaning, who should fix it, rough cost.
Readings
Moisture, temperature, levels and test results with time and place.
Insurance summary
Wiring, plumbing, heating and roof answers on one page.
How findings are written
Illustrative examples of the format. Prices are rough ranges to help planning, not quotes.
| Severity | Area and location | What it means | Who fixes it |
|---|---|---|---|
| Safety | Electrical Double-tapped breaker, panel bus position 7 | Two conductors under a screw rated for one. Loose connections can overheat. | Licensed electrician $150–300 |
| Repair | Roof Lifted shingles, south slope near ridge | Wind can tear lifted shingles and let water into the attic. | Roofer $300–600 |
| Repair | Grounds Downspout discharging 30 cm from foundation | Water against the foundation feeds basement leaks and soil movement. | Homeowner $20–60 |
| Monitor | Foundation Vertical crack 3 mm, NE corner (moisture 12%) | Typical shrinkage pattern; reading normal. Seal and mark; re-check each spring. | Homeowner $30 |
| Monitor | Structure Floor slopes 18 mm over 4 m toward centre beam | Common in Winnipeg basements on clay. Check telepost adjustment yearly. | Monitor — |
| Upgrade | Heating Furnace installed 2006, 20 years old | Near typical service life. Budget for replacement in 0–5 years. | HVAC contractor $5,000–8,000 |
Severity: Safety fix now; Repair fix soon; Monitor watch over time; Upgrade plan and budget.
Want this for your next home?
Get your exact price in under a minute.